{"id":13821,"date":"2019-04-04T00:00:00","date_gmt":"2019-04-04T00:00:00","guid":{"rendered":"https:\/\/essaybishops.com\/statistical-process-control-methods-2\/"},"modified":"2019-04-04T00:00:00","modified_gmt":"2019-04-04T00:00:00","slug":"statistical-process-control-methods-2","status":"publish","type":"post","link":"https:\/\/www.colapapers.com\/uk\/statistical-process-control-methods-2\/","title":{"rendered":"Statistical Process Control Methods"},"content":{"rendered":"<p>OPSCB\/574 Competency 1 Assessment and Rubric &#8211; grade miners score<br \/>\nCourse Title: Creating Value Through Operations<br \/>\nCompetency Assessment Title: Statistical Process Control Methods<br \/>\nTotal Number of Points: 100<br \/>\nAssignment Directions<br \/>\nStep 1: Process Evaluation<br \/>\nCreate a new Word doc for the elements of this assignment.<br \/>\nEvaluate your process using 1 of the following:<br \/>\n\u2022 Use the lean concept to find ways to eliminate waste and improve the process.<br \/>\n\u2022 Use SPC or Six Sigma to reduce defects or variances in the process.<br \/>\nAdd your evaluation to your Word doc with the header &#8220;Process Evaluation.&#8221;<br \/>\nStep 2: Evaluation of Control Chart and Process Metrics<br \/>\nComplete the following in Excel:<br \/>\n\u2022 Calculate the defined process metrics including variation and process capability.<br \/>\n\u2022 Develop and display a control chart for the process.<br \/>\n\u2022 Evaluate the control chart and process metrics using Statistical Process Control (SPC) methods. Determine whether the process could benefit from the<br \/>\nuse of Six Sigma, Lean, or other tools. (Include all calculation and charts.)<br \/>\nWrite your evaluation in your assignment Word doc under the header &#8220;Evaluation of Control Chart and Process Metrics.&#8221;<br \/>\nOPSCB\/574 Competency 1 Rubric &#8211; grade miners score Page 2 of 3<br \/>\nStep 3: Executive Summary<br \/>\nWrite a 700-word executive summary that includes the following:<br \/>\n\u2022 A summary of the Process Evaluation (using either Lean or SPC or Six Sigma)<br \/>\n\u2022 A summary of the Evaluation of Control Chart and Process metrics based on SPC methods<br \/>\n\u2022 A summary of your evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools<br \/>\n\u2022 A &#8211;  description of the SPC project and recommendations for improvements<br \/>\nAdd your summary to your Word doc with the header, &#8220;Executive Summary.&#8221;<br \/>\nOPSCB\/574 Competency 1 Rubric &#8211; grade miners score Page 3 of 3<br \/>\nCompetency Assessment Rubric &#8211; grade miners score<br \/>\nAssignment\/Performance<br \/>\nCriteria<br \/>\nMastery<br \/>\n100%<br \/>\nMeets Expectations<br \/>\n85%<br \/>\nNot Met<br \/>\n0%<br \/>\n1. Evaluation of the process<br \/>\n(weight 20%)<br \/>\nThoroughly evaluated the process. Partially evaluated the process. Narrowly evaluated the process or<br \/>\ndid not submit evaluation of<br \/>\nprocess.<br \/>\n2. Evaluation of the control chart and<br \/>\nprocess metrics using the statistical<br \/>\nprocess control methods<br \/>\n(weight 20%)<br \/>\nThoroughly evaluated the control<br \/>\nchart and process metrics using<br \/>\nstatistical process control methods.<br \/>\nPartially evaluated the control chart<br \/>\nand process metrics using statistical<br \/>\nprocess control methods.<br \/>\nNarrowly evaluated the control chart<br \/>\nand process metrics using statistical<br \/>\nprocess control methods or did not<br \/>\nsubmit evaluation of the control chart<br \/>\nand process metrics using statistical<br \/>\nprocess control methods.<br \/>\n3. Process evaluation summary<br \/>\n(weight 10%)<br \/>\nThoroughly developed a summary of<br \/>\nthe process evaluation.<br \/>\nPartially developed a summary of<br \/>\nthe process evaluation.<br \/>\nNarrowly developed a summary of the<br \/>\nprocess evaluation or did not submit a<br \/>\nsummary of the process evaluation.<br \/>\n4. Summary of control chart and<br \/>\nprocess metrics based on SPC<br \/>\nmethods<br \/>\n(weight 10%)<br \/>\nThoroughly developed a summary of<br \/>\nthe evaluation of control chart and<br \/>\nprocess metrics based on SPC<br \/>\nmethods.<br \/>\nPartially developed a summary of<br \/>\nthe evaluation of control chart and<br \/>\nprocess metrics based on SPC<br \/>\nmethods.<br \/>\nNarrowly developed a summary of the<br \/>\nevaluation of control chart and<br \/>\nprocess metrics based on SPC<br \/>\nmethods or did not submit a summary<br \/>\nof the process evaluation.<br \/>\n5. Six Sigma, Lean, or other tools<br \/>\nevaluation summary<br \/>\n(weight 10%)<br \/>\nThoroughly developed a summary of<br \/>\nthe evaluation of whether the<br \/>\nprocess would benefit from the use<br \/>\nof Six Sigma, Lean, or other tools.<br \/>\nPartially developed a summary of<br \/>\nthe evaluation of whether the<br \/>\nprocess would benefit from the use<br \/>\nof Six Sigma, Lean, or other tools.<br \/>\nNarrowly developed a summary of the<br \/>\nevaluation of whether the process<br \/>\nwould benefit from the use of Six<br \/>\nSigma, Lean, or other tools or did not<br \/>\nsubmit a summary of the evaluation of<br \/>\nwhether the process would benefit<br \/>\nfrom the use of Six Sigma, Lean, or<br \/>\nother tools<br \/>\n6. Description of the Statistical<br \/>\nProcess Control (SPC) project<br \/>\n(weight 15%)<br \/>\nProvided a detailed &#8211;  description of the<br \/>\nSPC project.<br \/>\nProvided a partial &#8211;  description of the<br \/>\nSPC project. Provided a narrow &#8211;  description of the<br \/>\nSPC project or did not provide a<br \/>\n&#8211;  description of the SPC project.<br \/>\n7. Recommendations for<br \/>\nimprovement<br \/>\n(weight 15%)<br \/>\nProvided detailed recommendations<br \/>\nfor improvements.<br \/>\nProvided partial recommendations<br \/>\nfor improvements. Provided vague recommendations<br \/>\nfor improvements or did not provide<br \/>\nrecommendations for improvements.<\/p>\n<p>____________________<br \/>\nHere is a rubric for assessing the competency in creating value through operations, specifically focusing on statistical process control methods:<\/p>\n<p>OPSCB\/574 Competency 1 Rubric &#8211; grade miners score<\/p>\n<p>Assignment\/Performance Criteria\tMastery (100%)\tMeets Expectations (85%)\tNot Met (0%)<br \/>\nEvaluation of the process (weight 20%) | Thoroughly evaluated the process. | Partially evaluated the process. | Narrowly evaluated the process or did not submit evaluation of the process.<br \/>\nEvaluation of the control chart and process metrics using the statistical process control methods (weight 20%) | Thoroughly evaluated the control chart and process metrics using statistical process control methods. | Partially evaluated the control chart and process metrics using statistical process control methods. | Narrowly evaluated the control chart and process metrics using statistical process control methods or did not submit evaluation of the control chart and process metrics using statistical process control methods.<br \/>\nProcess evaluation summary (weight 10%) | Thoroughly developed a summary of the process evaluation. | Partially developed a summary of the process evaluation. | Narrowly developed a summary of the process evaluation or did not submit a summary of the process evaluation.<br \/>\nSummary of control chart and process metrics based on SPC methods (weight 10%) | Thoroughly developed a summary of the evaluation of control chart and process metrics based on SPC methods. | Partially developed a summary of the evaluation of control chart and process metrics based on SPC methods. | Narrowly developed a summary of the evaluation of control chart and process metrics based on SPC methods or did not submit a summary of the process evaluation.<br \/>\nSix Sigma, Lean, or other tools evaluation summary (weight 10%) | Thoroughly developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools. | Partially developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools. | Narrowly developed a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools or did not submit a summary of the evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools.<br \/>\nDescription of the Statistical Process Control (SPC) project (weight 15%) | Provided a detailed &#8211;  description of the SPC project. | Provided a partial &#8211;  description of the SPC project. | Provided a narrow &#8211;  description of the SPC project or did not provide a &#8211;  description of the SPC project.<br \/>\nRecommendations for improvement (weight 15%) | Provided detailed recommendations for improvements. | Provided partial recommendations for improvements. | Provided vague recommendations for improvements or did not provide recommendations for improvements.<br \/>\nThe rubric evaluates the following aspects of the assignment:<\/p>\n<p>Evaluation of the process.<br \/>\nEvaluation of the control chart and process metrics using statistical process control methods.<br \/>\nProcess evaluation summary.<br \/>\nSummary of the control chart and process metrics based on SPC methods.<br \/>\nSix Sigma, Lean, or other tools evaluation summary.<br \/>\nDescription of the Statistical Process Control (SPC) project.<br \/>\nRecommendations for improvement.<br \/>\nEach criterion is assigned a weight, indicating its importance in the overall assessment. The &#8220;Mastery&#8221; column represents the criteria that demonstrate a thorough understanding and application of the concepts, while the &#8220;Meets Expectations&#8221; column indicates a satisfactory level of achievement. The &#8220;Not Met&#8221; column signifies that the criteria were not adequately addressed or not submitted.<\/p>\n<p>Grades can be assigned based on the performance level achieved in each criterion, and the total score can be calculated to determine the overall competency assessment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>OPSCB\/574 Competency 1 Assessment and Rubric &#8211; grade miners score Course Title: Creating Value Through Operations Competency Assessment Title: Statistical Process Control Methods Total Number of Points: 100 Assignment Directions Step 1: Process Evaluation Create a new Word doc for the elements of this assignment. Evaluate your process using 1 of the following: \u2022 Use [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5584,5217,5589,5586,5591,5594,5590,5587,5583,5593,5592,5588,5582,5585,5595],"tags":[5597,5601,5602,5605,3665,5603,2339,5607,4868,5598,5604,5606,5600,3325,5599,5596],"class_list":["post-13821","post","type-post","status-publish","format-standard","hentry","category-assessment-homework-help-online","category-australia-essays","category-best-ideas-for-dissertation-topics","category-best-ideas-for-research-paper-topics-in","category-best-thesis-topics-and-ideas-on-different-subjects","category-dissertation-topics-good-thesis-ideas","category-dissertation-topics-for-ph-d-and-thesis-ideas","category-dissertation-topics-for-students-in","category-help-with-australia-assessment-assignment","category-research-topics-for-college-students","category-sample-thesis-titles","category-trending-dissertation-topics-ideas-for","category-uk-assessment-assignment-help","category-uk-essays","category-undergraduate-dissertations-topics-examples-ideas","tag-essay-service-website","tag-essay-writer-from-usa","tag-hire-a-professional-essay-writer","tag-hire-essay-writer-for-your-papers","tag-i-need-help-writing","tag-i-will-pay-someone-to-write-my-essay","tag-looking-for-someone-to-do-my-assignments","tag-online","tag-page-paper","tag-pay-for-essay-get-top-quality","tag-pay-someone-to-write-my-paper","tag-professional-paper-writing-service","tag-professional-to-write-my-essay","tag-write-a-paper","tag-write-my-essay-for-me-by-native-writer","tag-write-my-essay-no-plagiarism"],"_links":{"self":[{"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/posts\/13821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/comments?post=13821"}],"version-history":[{"count":0,"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/posts\/13821\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/media?parent=13821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/categories?post=13821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.colapapers.com\/uk\/wp-json\/wp\/v2\/tags?post=13821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}