{"id":72610,"date":"2025-01-21T23:40:44","date_gmt":"2025-01-21T23:40:44","guid":{"rendered":"https:\/\/essays.homeworkacetutors.com\/structure-of-electricity-industry-in-ireland\/"},"modified":"2025-01-21T23:40:44","modified_gmt":"2025-01-21T23:40:44","slug":"structure-of-electricity-industry-in-ireland","status":"publish","type":"post","link":"https:\/\/www.colapapers.com\/us\/structure-of-electricity-industry-in-ireland\/","title":{"rendered":"Structure of Electricity Industry in Ireland"},"content":{"rendered":"<div class=\"content position-relative mb-4\">\n<div>\n<p>\nSTRUCTURE OF ELECTRICITY INDUSTRY IN IRELAND\n<\/p>\n<\/p>\n<h2>\n1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 KEY FEATURES OF THE ELECTRICITY INDUSTRY IN IRELAND<br \/>\n<\/h2>\n<h3>\n1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 WHOLESALE MARKET &amp; SYSTEM MARGINAL PRICE<br \/>\n<\/h3>\n<h4>\n1.1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SINGLE ELECTRICITY MARKET \u2013 SEM<br \/>\n<\/h4>\n<p>\nThe Single Electricity Market or SEM is the wholesale electricity market operating in the Republic of Ireland and Northern Ireland. It is regulated by the Commission for Energy Regulation (CER) in the Republic of Ireland and by the Utility Regulator in Northern Ireland.\n<\/p>\n<p>\nIt was created in 2007 to combine the two separate markets. The aim of the SEM was to provide competitive, sustainable and reliable wholesale electricity market and deliver long-term economic and social benefits, as well as lower cost of electricity generation.\n<\/p>\n<h4>\n1.1.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SINGLE ELECTRICITY MARKET OPERATOR<br \/>\n<\/h4>\n<p>\nThe SEM is operated and administrated by Single Electricity Market Operator (SEMO). The organization is managed by Eirgrid in the Republic of Ireland and SONI in Northern Ireland.\n<\/p>\n<h4>\n1.1.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SYSTEM MARGINAL PRICE<br \/>\n<\/h4>\n<p>\nThe SEM design is a centralised and mandatory all-island wholesale pool market, through which generators and suppliers trade electricity. Generators submit bid into this pool based on their fuel related operating costs.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.001.png\"><br \/>\n<\/img><\/p>\n<p>\nFigure 1. SEM \u2013 Wholesale electricity market all-Ireland<a href=\"#_ftn1\">[1]<\/a>\n<\/p>\n<p>\nThe System Marginal Price (SMP) is determined by SEMO based on generator costs and on customer demand for electricity in half-hour periods. The SEMO determines the cheapest generator cost bids necessary to meet the demand. The most expensive generators are \u201cout of merit\u201d and they are not run and are not paid SMP, keeping prices down.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.002.png\"><br \/>\n<\/img><\/p>\n<p>\nFigure 2. More expensive generators are \u201cout of merit\u201d and hence they are not run and are not paid SMP.<a href=\"#_ftn2\">[2]<\/a>\n<\/p>\n<p>\nThe mandatory centralised pool model in SEM in which all generators and suppliers must participate, has provided more transparency, and brought in new efficient generators into the market. Hence, providing environmental benefits. This has helped to keep prices down and provide security of supply.\n<\/p>\n<h3>\n1.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 FUEL MIX TRENDS<br \/>\n<\/h3>\n<h4>\n1.2.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ELECTRICITY DEMAND<br \/>\n<\/h4>\n<p>\nElectricity demand is a fundamental aspect when analysing energy generation and assessing the capacity market. It is important to understand the energy demand to ensure just enough generation to keep the system.\n<\/p>\n<ul>\n<li>\nTHE EFFECT OF WEATHER ON DEMAND\n<\/li>\n<\/ul>\n<p>\nTemperature has a great impact on electricity demand in Ireland and Northern Ireland. For this reason, some historical data are adjusted.\n<\/p>\n<p>\nMost of the sources used for this assignment refers to this adjustment as normalised or temperature correction and in other it does not adjust the figures. Therefore, some results might differ.\n<\/p>\n<ul>\n<li>\nHISTORICAL PEAK DEMAND\n<\/li>\n<\/ul>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.003.png\"><br \/>\n<\/img><\/p>\n<p>\nFigure 3. Past values of recorded maximum demand. <a href=\"#_ftn3\">[3]<\/a>\n<\/p>\n<h4>\n1.2.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 FUEL MIX FOR ELECTRICITY GENERATION<br \/>\n<\/h4>\n<p>\nSince the mid-1990s until now the use of higher efficiency natural gas plants and the increase in production from renewable sources. Between the years 2001 and 2004 took placed an increase in imports of electricity and the closure of old peat fired stations, as well as the coming of a new steam Combined Cycle Power plant (392 MW in August 2002 and 343 MW in November 2002).<a href=\"#_ftn4\">[4]<\/a> These shifts in generating technology have had a direct effect in the efficiency of electricity supply.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.004.png\"\/>\n<\/p>\n<p>\nFigure 4. Efficiency of electricity supply. Source SEAI 2017 Report<a href=\"#_ftn5\">[5]<\/a>\n<\/p>\n<p>\nElectricity generation has increased significantly over the period 1990-2017, the share of renewable sources on electricity generation has being increasing since 1992, due to the new wind power capacity.\n<\/p>\n<ul>\n<li>\nFuel-mix for electricity generation by fuel type:\n<\/li>\n<\/ul>\n<p>\nTable 1. Percentage of fuel-mix provided by CRU 2017 report. (These figures represent the breakdown of the mix of energy provided by suppliers to their costumers)\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.005.png\"\/>\n<\/p>\n<p>\nIn the table 1 above results for renewable energy is includes GOs imports, which differs considerably we compared with results published by the Sustainable Energy Authority of Ireland for 2016.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.006.png\"\/>\n<\/p>\n<p>\nFigure 5. Flow of Energy in Electricity Generation 2016 \u2013 Outputs by fuel<a href=\"#_ftn6\">[6]<\/a>. Note: Output percentage for Wind Energy was 20.4% (22.3% normalised) and overall number do not include imported GOs\n<\/p>\n<h4>\n1.2.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 THE ADOPTION OF WIND GENERATION<br \/>\n<\/h4>\n<p>\nThe first commercial wind farm was installed in Ireland in 1992 at Bellacorrick, co Mayo with a total installed capacity of 6.45 MW. Since then wind energy capacity has been gradually increasing to EU targets for renewable energy. Nowadays the largest wind farm intalled capacity is in Meenadreen, co Donegal with a power of 95 MW.\n<\/p>\n<p>\nAt the present there are 226 wind farms operational in the Republic of Ireland and 276 in the all island the current installed capacity is 4,471 MW in the Republic of Ireland and 1,160 MW in Northern Ireland.\n<\/p>\n<ul>\n<li>\nWind capacity between 1997 to 2017 for the Republic of Ireland is shown in the table below:\n<\/li>\n<\/ul>\n<p>\nTable 2. Ireland\u00b4s wind capacity 1997-2017<a href=\"#_ftn7\">[7]<\/a><a href=\"#_ftn8\">[8]<\/a>\n<\/p>\n<table>\n<tr>\n<td>\n<p>\nYear\n<\/p>\n<\/td>\n<td>\n<p>\nWind Capacity (MW)\n<\/p>\n<\/td>\n<td>\n<p>\nYear\n<\/p>\n<\/td>\n<td>\n<p>\nWind Capacity (MW)\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>1997<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n57.23\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2009<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n1264.832\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>1998<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n62.23\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2010<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n1405.948\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>1999<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n70.81\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2011<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n1613.908\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2000<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n117.16\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2012<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n1738.498\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2001<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n123.56\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2013<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,232\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2002<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n135.46\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2014<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,263\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2003<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n209.72\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2013<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,232\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2004<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n336.14\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2014<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,263\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2005<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n492.94\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2015<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,447\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2006<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n673.64\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2016<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n2,779\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2007<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n740.98\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2017<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n3,311\n<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\n<strong>2008<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n939.512\n<\/p>\n<\/td>\n<td>\n<p>\n<strong>2018<\/strong>\n<\/p>\n<\/td>\n<td>\n<p>\n\u2013\n<\/p>\n<\/td>\n<\/tr>\n<\/table>\n<ul>\n<li>\nFuel-mix of renewable energy:\n<\/li>\n<\/ul>\n<p>\nTable 3. Renewable Energy (%) Contribution to Gross Final Consumption.<a href=\"#_ftn9\">[9]<\/a>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.007.png\"\/>\n<\/p>\n<h4>\n1.2.4\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 THE ADOPTION OF CCGT AND PEAKING PLANTS<br \/>\n<\/h4>\n<p>\nThe majority of the power plants in operation today use Combined Cycle Generation Turbines (CCGT) technology, thus the gas turbine is used to produce electricity in combination with a bottoming water-steam cycle. By using waste heat from the gas turbine exhaust to generate electricity, the net result is highly efficient overall plant with low emissions.\n<\/p>\n<p>\nCCGT plants were designed to generate electricity 24 hours a day, seven days a week. However, with the recent growth in wind generation, CCGT plants are expected to operate in a more flexible way, thus when the wind is blowing, the demand for electricity from conventional generation falls, and when the wind drops off, more electricity from conventional plant is needed to meet the demand. This process is known as \u2018two-shifting\u2019, and is a common requirement for CCGT plants.\n<\/p>\n<p>\nThe simple cycle peaking plants, or peakers, are power plants generally run only when there is a high demand for electricity. The impact of those peaking plants effect to the cost electricity prices, due to in peaking plants the fuel would be the same price as in CCGT, but those cost for much lower capacity and fewer hours of operation results in higher electricity prices.\n<\/p>\n<h3>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.008.png\"\/><br \/>\n<\/h3>\n<\/p>\n<h3>\n1.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SUPPLY CHAIN<br \/>\n<\/h3>\n<h4>\n1.3.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 GENERATION<br \/>\n<\/h4>\n<h5>\n1.3.1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ESB GENERATION<br \/>\n<\/h5>\n<h5>\n1.3.1.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 WINDFARMS<br \/>\n<\/h5>\n<h5>\n1.3.1.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 INTERCONNECTORS<br \/>\n<\/h5>\n<p>\nCurrently the transmission networks of Northern Ireland and the Republic of Ireland are connected electrically by means of one 275 kV double circuit connection\n<\/p>\n<h6>\n1.3.1.3.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 EAST-WEST INTERCONNECTOR (EWIC)<br \/>\n<\/h6>\n<p>\nThe East\u2013West Interconnector is owned by EirGrid and links the electricity grids of the island of Ireland and Great Britain via submarine cables running between converter stations in Ireland and Wales. It was completed in 2012 and it is a High Voltage Direct Current (HVDC) connection capable of providing capacity of 500 MW, flowing in both directions (import \/ export).\n<\/p>\n<h6>\n1.3.1.3.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 NOTHERN IRELAND \u2013 SCOTLAND INTERCONNECTOR<br \/>\n<\/h6>\n<p>\nIt links in Great Britain through the Moyle Interconnector to Scotland. The interconnector has a nominal capacity of 500 MW.<a href=\"#_ftn10\">[10]<\/a>\n<\/p>\n<h5>\n1.3.1.4\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 IPPS<br \/>\n<\/h5>\n<h4>\n1.3.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 NETWORK: TRANSMISSION &amp; DISTRIBUTION<br \/>\n<\/h4>\n<p>\nThe infrastructure around the country is divided in distribution and transmission network. The transmission network is in charge of sending electricity from generating stations to main points in the country, operates at high voltage and is the backbone of the electricity supply system. Eirgrid is responsible for the operation, maintenance and development of the transmission system.\n<\/p>\n<p>\nThe distribution network sends electricity supply to customers, and operates at medium to low voltage. ESB Networks is responsible for the operation, maintenance and development of the distribution network in Ireland.\n<\/p>\n<h4>\n1.3.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SUPPLY<br \/>\n<\/h4>\n<\/p>\n<h3>\n1.4\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 INTERCONNECTION &amp; SECURITY SUPPLY<br \/>\n<\/h3>\n<h4>\n1.4.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ENERGY SECURITY<br \/>\n<\/h4>\n<p>\nThe International Energy Association (IEA) defines energy security as \u201cthe uninterrupted availability of energy sources at an affordable price\u201d<a href=\"#_ftn11\">[11]<\/a>and it relates to energy import dependency.\n<\/p>\n<p>\nThe geographical location of Ireland means that it is naturally isolated from the European electricity grid and the small market size leads to risks to the security of supply and possible reduction of competition.\n<\/p>\n<p>\nThis isolation has been addressed by building interconnection infrastructure that links Ireland to other markets. Ireland currently has electricity interconnection with Northern Ireland (as part of the Single Electricity Market) and with Great Britain.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.009.png\"\/>\n<\/p>\n<p>\nFigure 7. Import Dependency of Ireland and the EU. Ireland\u2019s dependency changed after 2016 due to start of natural gas production on the Corrib gas field. <a href=\"#_ftn12\">[12]<\/a>\n<\/p>\n<h4>\n1.4.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 I-SEM<br \/>\n<\/h4>\n<p>\nAs discussed earlier the wholesale Single Electricity Market (SEM) for the all-Ireland is in operation since 2007. However, European Union is currently in the process of developing the Integrated Single Electricity Market which will introduce a free trade of electricity across the borders as the part of European single market.\n<\/p>\n<p>\nThe Integrated Energy Market will join 20 countries including, coupled by 38 cross-border interconnectors, containing a total generating capacity of over 3,000 terawatts (TW).<a href=\"#_ftn13\">[13]<\/a>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.010.png\"\/>\n<\/p>\n<p>\nFigure 8. Internal market showing cross-border interconnectors.<a href=\"#_ftn14\">[14]<\/a>\n<\/p>\n<h4>\n1.4.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 CELTIC INTERCONNECTOR<br \/>\n<\/h4>\n<p>\nEuropean Union goal is to develop an Internal Energy Market within Europe. This will require the physical infrastructure of interconnection between Ireland and mainland Europe.\n<\/p>\n<p>\nEirGrid is currently exploring an interconnector between Ireland and France, known as the Celtic Interconnector. A series of joint studies between Eirgrid and the French transmission system operation (R\u00e9seau de Transport d\u2019\u00c9lectricit\u00e9 \u2013 RTE) have been carried out since 2011 and final decision will be taken by 2021.\n<\/p>\n<p>\nThe capacity of the Celtic Interconnector is estimated at approximately 700 megawatts (MW), and the length of the subsea cable would be have a total length of approximately 600 km. <a href=\"#_ftn15\">[15]<\/a>\n<\/p>\n<p>\nThe purpose of this interconnector is to improve security of supply for Irish electricity users, by providing Ireland with direct energy connection to an EU Member State once the United Kingdom leaves the EU, and to increase competition and efficient use of renewables.\n<\/p>\n<\/p>\n<h3>\n1.5\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 REGULATORY FEATURES<br \/>\n<\/h3>\n<h4>\n1.5.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ELECTRICITY SUPPLY BOARD ACT, 1927<br \/>\n<\/h4>\n<h4>\n1.5.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ENERGY DIRECTIVE, 1996<br \/>\n<\/h4>\n<h4>\n1.5.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 THE COMMISSION FOR ENERGY REGULATION, 1999 &amp; 2003<br \/>\n<\/h4>\n<p>\n\u201cThe Commission for Energy Regulation (CER) is the independent body responsible for regulating the natural gas and electricity markets in Ireland.\u201d CER Factsheet on the Single Electricity Market April 2011\n<\/p>\n<p>\n2020 <img decoding=\"async\" alt=\"\" src=\"images\/0463633.011.png\"\/>\n<\/p>\n<\/p>\n<h3>\n1.6\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 REFERENCES<br \/>\n<\/h3>\n<p>\nCER Factsheet on the Single Electricity Market. <a href=\"https:\/\/www.cru.ie\/wp-content\/uploads\/2011\/07\/cer11075.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/www.cru.ie\/wp-content\/uploads\/2011\/07\/cer11075.pdf<\/a>\n<\/p>\n<p>\nSustainable Energy Authority of Ireland (2015), <em>Energy Security in Ireland<\/em>, www.seai.ie\n<\/p>\n<\/p>\n<h2>\n2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ENERGY MARKET INTEGRATION<br \/>\n<\/h2>\n<p>\nThe Single Electricity Market (SEM) is undergoing through significant change. EU legislation is driving a merge of energy markets across Europe. The purpose is to create a fully liberalised internal electricity market.\n<\/p>\n<p>\nThe new wholesale market will be known as the Integrated Single Electricity Market (I-SEM) and must be in place by the end of 2017. The I-SEM will deliver higher levels of competition as well as lower prices and increase security of supply and transparency.\n<\/p>\n<h3>\n2.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 European market integration<br \/>\n<\/h3>\n<h3>\n2.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Grid development<br \/>\n<\/h3>\n<h3>\n2.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The future of renewable energy<br \/>\n<\/h3>\n<p>\nProject Ireland 2040, the National Planning Framework13, sets out a number of priorities for policy in the energy sector, including commitments around decarbonising the energy system, increasing renewable energy and reinforcements of the distribution and transmission network to facilitate planned economic growth, to strengthen energy security and to support an island population of up to 8 million people.\n<\/p>\n<p>\n<a href=\"http:\/\/www.eirgridgroup.com\/annual-report-2017\/\" target=\"_blank\" rel=\"noopener\">http:\/\/www.eirgridgroup.com\/annual-report-2017\/<\/a>\n<\/p>\n<\/p>\n<h2>\n3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ELECTRICAL TARIFFS<br \/>\n<\/h2>\n<p>\nMost loads on an electrical distribution system fall into three categories: resistive, inductive and capacitive. The most common is inductive, this includes transformers, fluorescent lighting and AC induction motors. Most inductive loads use a conductive coil winding to produce an electromagnetic field that allows the motor to function.\n<\/p>\n<p>\nInductive loads require two kinds of power to operate. Active or useful power to produce motion, and reactive or magnetic power to energise the magnetic field.\n<\/p>\n<p>\nIn large industrial sites are likely to used electrical equipment that requires wattless energy to operate. Wattles energy is measure separately from the general units, and if you exceed a certain limit, it will result in an extra charge.\n<\/p>\n<h3>\n3.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 POWER FACTOR<br \/>\n<\/h3>\n<p>\n<em>\u201cPower factor is the ratio between the useful power (kW) and the total power (kVA)consumed by an item of A.C. electrical equipment or a complete electrical installation. It is a measure of how efficiently power is converted into useful work output.\u201d IEEE <\/em><a href=\"https:\/\/electrical.theiet.org\/media\/1687\/power-factor-correction-pfc.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/electrical.theiet.org\/media\/1687\/power-factor-correction-pfc.pdf<\/a>\n<\/p>\n<h4>\n3.1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 TRUE, REACTIVE &amp; APPARENT POWER<br \/>\n<\/h4>\n<p>\nTrue or active power is the current and voltage consumed and registered on the meter. It performs the actual work, such as creating heat, light and motion. True power is expressed in kilowatts (kW), which is expressed in kWh on your electric meter.\n<\/p>\n<p>\nReactive power is not useful work, but it is required to sustain the electromagnetic field associated with commercial and industrial loads. Reactive power takes space in the distribution lines. It is measured in kVAr, kilovolt-amperes-reactive.\n<\/p>\n<p>\nThe resultant capacity is known as apparent power or total power, it is measured in kVA, kilovolt-ampere.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.012.png\"\/>\n<\/p>\n<p>\nFigure 2.IT Sligo notes\n<\/p>\n<h4>\n3.1.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 BENEFITS OF A GOOD POWER FACTOR\u00a0 taken from GMIT notes need to verify<br \/>\n<\/h4>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Environmental benefit. Reduction in power consumption due to improve energy efficiency means les gas emissions and fossil fuels by power stations.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Reduction of electricity bills.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Extra kVA available from the existing supply.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Reduction of I<sup>2<\/sup>R losses in transformers and distribution equipment.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Reduction on voltage drops in long cables.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Extended equipment life by reducing electrical and heat burden on cables and electrical components.\n<\/p>\n<h4>\n3.1.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 DISADVANTAGES OF POOR POWER FACTOR<br \/>\n<\/h4>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Larger cables required carrying the same load.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Larger switchgear and transformers required.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Larger currents give rise to higher CU and AL losses in cables.\n<\/p>\n<p>\n&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Larger currents give larger voltage drops in cables.\n<\/p>\n<h3>\n3.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ENERGY BILLS<br \/>\n<\/h3>\n<p>\nThe following sample electricity bill was provided. Some penalties \u2026.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.014.png\"\/><img decoding=\"async\" alt=\"\" src=\"images\/0463633.014.png\"\/><img decoding=\"async\" alt=\"\" src=\"images\/0463633.013.png\"\/><img decoding=\"async\" alt=\"\" src=\"images\/0463633.015.png\"\/>\n<\/p>\n<h4>\n3.2.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 LOW POWER FACTOR SURCHARGE<br \/>\n<\/h4>\n<p>\nIf the number of wattless units you use in a single billing period exceeds a limit of one-third of all your general units, a charge will be applied. The term power factor is to express the ratio between active and reactive power. A power factor of 0.95 must be maintained in order to avoid wattless charges. Power factor values can vary from 0 to 1. The closest to 1 the better power factor.\n<\/p>\n<p>\nIn the case of consumption of wattless units increases above one third of your total units per bill, then the power factor will drop below 0.95, and the low power factor surcharge will be applied.\n<\/p>\n<p>\nTo improve the power factor, it is necessary to fit power factor correction equipment to reduce the amount of reactive power consumed. Power factor correction is achieved by the addition of capacitors in parallel with the connected motor or lighting circuits.\n<\/p>\n<p>\nPower distributors offer incentives for operating with a good power factor better than 0.95,.by for example penalizing consumers with a poor power factor, in order to reduce wasted energy in the distribution system.\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.016.png\"\/>\n<\/p>\n<p>\nFigure 1. A phase angle difference, \u03d5 exists between voltage and currents in an AC circuit. The cosine of \u03d5 (or Cos \u03d5) is termed as the power factor. <a href=\"https:\/\/www.electronicshub.org\/power-factor-and-its-correction\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.electronicshub.org\/power-factor-and-its-correction\/<\/a>\n<\/p>\n<h4>\n3.2.2\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 WINTER MAXIMUM CHARGE<br \/>\n<\/h4>\n<h4>\n3.2.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 MAXIMUM IMPORT CAPACITY (MIC)<br \/>\n<\/h4>\n<p>\nThe maximum import capacity is the maximum electrical capacity of the connection point between ESB networks and the customer. In order to maintain standards of supply, the customer\u2019s demands should not exceed the max. capacity agreed. MIC is measured in kVA\n<\/p>\n<p>\nCustomers are charged based on Maximum Demand. Maximum Demand is the highest demand value during billing period. Maximum demand meters record customer\u2019s consumption over 15-minute intervals.\n<\/p>\n<h4>\n3.2.4\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 REDUCTION OF UTILITY BILL<br \/>\n<\/h4>\n<p>\n<strong>Electricity bill details:<\/strong>\n<\/p>\n<ul>\n<li>\nTariff= Low Voltage Demand Tariff\n<\/li>\n<li>\nBilling period= 1 January \u2013 31 January = 31 days = 744 hours\n<\/li>\n<li>\nDay units= 45,409 kWh\n<\/li>\n<li>\nNight units= 14,984 kWh\n<\/li>\n<li>\nTotal units= 60,393 kWh\n<\/li>\n<li>\nWattles charges= 5,169 kVAr hr\n<\/li>\n<\/ul>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.017.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.018.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.019.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.020.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.021.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.022.png\"\/>\n<\/p>\n<p>\n<img decoding=\"async\" alt=\"\" src=\"images\/0463633.023.png\"\/>\n<\/p>\n<h3>\n3.3\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 REFERENCES<br \/>\n<\/h3>\n<p>\n<em>\u00a0<\/em>\n<\/p>\n<p>\n<em>\u00a0<\/em>\n<\/p>\n<p>\n<em>Section 3:<\/em>\n<\/p>\n<p>\n<em>IEEE <\/em><a href=\"https:\/\/electrical.theiet.org\/media\/1687\/power-factor-correction-pfc.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/electrical.theiet.org\/media\/1687\/power-factor-correction-pfc.pdf<\/a>\n<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>STRUCTURE OF ELECTRICITY INDUSTRY IN IRELAND 1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 KEY FEATURES OF THE ELECTRICITY INDUSTRY IN IRELAND 1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 WHOLESALE MARKET &amp; SYSTEM MARGINAL PRICE 1.1.1\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SINGLE ELECTRICITY MARKET \u2013 SEM The Single Electricity Market or SEM is the wholesale electricity market operating in the Republic of Ireland and Northern Ireland. It is regulated by the Commission for [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5834],"tags":[9739,9790,9789,9738,9787,9788,9737],"class_list":["post-72610","post","type-post","status-publish","format-standard","hentry","category-environmental-sciences","tag-affordable-academic-writing-services-usa","tag-assignment-help-for-masters-students","tag-online-class-and-exam-help","tag-thesis-and-dissertation-writing-uk","tag-uk-college-assignment-writing-help","tag-write-my-homework-essay-today","tag-write-my-paper-services-cheap"],"_links":{"self":[{"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/posts\/72610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/comments?post=72610"}],"version-history":[{"count":0,"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/posts\/72610\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/media?parent=72610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/categories?post=72610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.colapapers.com\/us\/wp-json\/wp\/v2\/tags?post=72610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}